Specifications |
| Structure | ||||||||
| Structure | : | RCC flat slab and column structure with brick/concrete block partitions to maximise clear spans. | ||||||
| Esclators | : | Connecting Retail Floors | ||||||
| Elevators | : | 4 Passenger elevators with
separate service elevators 2 Passenger elevators exclusive for retail floors |
||||||
| Floor to Floor Height | : | Retail floors 4.5m Oce floors 3.75m |
||||||
| Finishes | ||||||||
| External Cladding | : | Combination of glass curtain wall, alluminium panel and polished stone | ||||||
| Flooring | : | Lobbies : Combination of
Marble, granite/Ceremic Tile Basement : Brushed concrete Tenant floor finish : Concrite Floor |
||||||
| Toilets: | : | Finished Toilets with modern fittings and fixtures | ||||||
| Atrium Lobby | : | Full height glazing in front Wood panelling on rest of the wall Marble/granite flooring Custom lighting |
||||||
| Typical Core Finish | : | Plasterboard/masonry/concrete
painted Stainless steel ironmongery Veneered timber doors |
||||||
| Parking | ||||||||
| Parking: | : | 3-level basement for parking
and services. Adequate surface parking. Provision for access control and Video serivilence. |
||||||
| Security | ||||||||
| Video serivilence | : | External access points Car park areas Atrium/lobby Passenger lift cab Option for connection of camera in tenant's lift lobby |
||||||
| Manned Security | : | At all entry, exit points and patrol as needed | ||||||
| Life Safety | ||||||||
| Wet Riser/Hose Reels | : | Located near each staircase | ||||||
| Sprinklers | : | Fully provided in landlords premises and primary distribution on each floor. Tap o points available for secondary distribution. | ||||||
| Fire Hydrants | : | Provided at ground level as per design | ||||||
| Hand-held Extinguishers | : | Provided as required in landlord's areas | ||||||
| Fire Detection | : | Main alarm panels, break glass contacts, smoke and heat detectors provided within all public and landlord's areas. Provision of connection from tenant's area to main system. | ||||||
| HVAC | ||||||||
| HVAC System | : | Central Chiller system with seprate AHUs for each unit and common areas | ||||||
| BMS and Controls | : | System monitoring the principle operations of the building. Control system fully integrated with the security, fire alarm and lift control systems. | ||||||
| Ventilation and Exhaust | : | Provided for toilets, cores and basements. Separate ventilation for DG. | ||||||
| Electrical | ||||||||
| Electrical Risers | : | Provided | ||||||
| Distribution Boards | : | Feeds, splitters and panel boards serving tenant from load side provided All wiring till entry to tenant's premises. | ||||||
| Metering | : | Metering split into common loads and tenant loads, which will be sub-metered | ||||||
| Lightning Protection & Earthing Pits | : | Lightning pits provided for base building. Provision for tenant connection to earthing pits. | ||||||
| Fire Alarm System | : | Main alarm panels, break glass contacts, smoke and heat detectors provided within all public and landlord's areas. Provision of connection from tenant's area to main system. | ||||||
| Emergency Lighting | : | Emergency light fixtures (connected to landlord's UPS) provided on escape route and at all means of egress. | ||||||
| DG | ||||||||
| Diesel Generators | : | 100% fully automatic backup provided for lighting, power and AC | ||||||
| Features | : | Automatic voltage regulator, PLC based auto-starting, auto-load balancing AMF panel system provided | ||||||
| Landscape | ||||||||
| Roadways & Surface Parking | : | Asphalt and interlocked precast pavers/stone cobbles as per design | ||||||
| Pedestrian and Roadway Lighting | : | Pole and bollard mounted fixtures | ||||||
| Building Façade Lighting | : | Feature lighting of façade with fixtures concealed within landscaped areas | ||||||
| Site Landscape | : | Landscape garden with decorative features as per design | ||||||
|
Payment
Plan |
| On Booking | - | 15% |
| Within 45 Days | - | 10% |
| Within 90 Days | ||
| Commencement Of Construction | ||
| Whichever Is Earlier | - | 10% |
| 3rd Basement Roof | - | 7.50% |
| 1st Basement Roof | - | 7.50% |
| Ground Floor Slab | - | 7.50% |
| 2nd Floor Slab | - | 7.5% + 50% PLC |
| 4th Floor Slab | - | 5% + 50% PLC |
| 6th Floor Slab | - | 5% |
| 8th Floor Slab | - | 5% + 50% CAR PARK |
| 10th Floor Slab | - | 5% + 50% CAR PARK |
| 12th Floor Slab | - | 5% |
| Installation Of Services | - | 5% |
| Notice Of Possession | - | 5% + IBMS + |
| Registration Charges |